Hairy Socialists for Cat Lovers . com

Archive for March, 2013

PK #6: Everything ready to go

[See all Project Knees – Bike Electrification Project posts] The electronics are all assembled and working. The front panel has a push switch, an LED (lit up, to prove it’s working), and on the right the connector to join up with the throttle and motor. Behind it are the three batteries and the board with […]

PK #5: cable and box assembly

[See all Project Knees – Bike Electrification Project posts] I haven’t posted in a small while, mostly because I’ve been waiting for the batteries to be delivered: a series of mistakes by a UKMail delivery driver meant they took over three weeks to arrive. However, they finally got here, so I could measure up and […]